Energy and valuable materials for the next generation

With an investment of more than CHF 500 million, kenova is one of Switzerland's most significant infrastructure projects in the fields of environmental services, renewable energy, and circular economy. Located in Zuchwil, the new kenova facility replaces the existing plant after nearly 50 years of operation and will ensure the sustainable treatment of waste from 176 municipalities. As a landmark project for future generations, it plays a key role in advancing the energy transition and strengthening the circular economy. Featuring one of the largest photovoltaic façades in the world, striking architecture, and one of Switzerland's largest renewable energy-based thermal power plants, the facility is also designed to accommodate future carbon capture technology.

The Project at a Glance

Gebäudetrimetrie

Copyright image: Penzel Valier

Key Facts

Gross Floor Area (GFA)

44,000 m²

Building Volume

410,000 m³

Combustible Construction and Municipal Waste

over 1,000 t per working day

Waste Processed Annually

250,000 t

Bunker Capacity

12,000 L

Electricity Generation

Annual electricity generation: 160 GWh

The steam turbine operates at more than 4,000 rpm.

The generator has a maximum output of 37 MW.

The plant generates enough electricity to supply more than 40,000 households.

Waste heat from the plant provides district heating for approximately 12,000 buildings.

District Heating

120 GWh

Total Vertical Photovoltaic Area

5,400 m²

Total Photovoltaic Capacity (Facade and Roof)

1.4 MWp

Concrete Used

56,000 m³

Recycled Concrete Content

approx. 60%

Natural Stone Façade Band

3,000 m

Timber Façade Structure (Process Hall)

6,000 m²

Timber Roof Structure (Process Hall)

2,000 m²

Project Timeline

2015

Start of Project Planning

2016

Architectural Design Competition

2020

Start of Construction

2025

Occupancy

2025

Commissioning

2028

Completion

From Waste to Energy and Valuable Materials

kenova exemplifies the transformation from a conventional waste incineration plant into a modern energy centre. Today, the focus is no longer solely on the safe treatment of waste. Modern facilities recover both energy and valuable materials from waste, helping to close the loop in the circular economy.

The new facility replaces four existing furnace lines with two significantly more powerful and efficient lines. Each year, up to 250,000 tonnes of waste will be converted into electricity, district heating, and recovered materials for further use.

By utilising CO2-free waste heat to generate electricity and district heating, incorporating a large-scale photovoltaic façade, and being designed to accommodate future carbon capture technologies, kenova demonstrates how a waste-to-energy plant can become an important building block of a sustainable energy future. In addition, both ferrous and non-ferrous metals are recovered from the incineration residues, returning valuable materials to the circular economy.

Technische Anlage
Technische Anlage

Copyright: Federico Farrinetti

Technische Anlage

Copyright: Federico Farrinetti

A Project for the Next 50 Years

The new energy centre was not built on a greenfield site but developed alongside the continued operation of the existing facility. While the original plant continued to ensure reliable waste management for the region, the next generation of infrastructure was delivered step by step.

This unique starting point required long-term planning and a holistic approach to the Emmenspitz site. Rather than simply replacing the existing plant, the entire site was reimagined and redeveloped to provide the flexibility needed to accommodate future technologies and evolving requirements for generations to come.

The result is more than just a replacement facility. It lays the foundation for the long-term development of the entire Emmenspitz site.

Power to Gas facility

Copyright: Federico Farrinetti

«Technology alone doesn't shape the future. People who learn together do.»

Joachim Rutz, TBF + Partner

Our Contribution: Mastering Complexity Together

Delivering the kenova project required far more than technical expertise. Over the course of more than a decade, a wide range of interests, disciplines, and requirements had to be brought together - from strategic decision-making through technical development to construction and on-site delivery.

As overall project manager, TBF + Partner coordinated the collaboration between all project stakeholders and established the organisational framework for successful project delivery. At the heart of the project were not only processes and technology, but above all the people who worked together to bring it to life.

Step by step, this gave rise to a landmark project built on trust, collaboration, and interdisciplinary thinking.

Shaping the Future Together

Infrastructure requirements are constantly evolving. New technologies, changing regulations, and shifting societal expectations demand flexible, future-oriented solutions.

kenova demonstrates how interdisciplinary collaboration, digital methods such as BIM, and the willingness to embrace new approaches contribute to the successful implementation of complex infrastructure projects. In doing so, the future is not shaped by technology alone, but by people working together to develop innovative solutions.

Learning Future

Copyright: Federico Farrinetti

Learning Future

Project Partners

Overall Planning

Overall Project Management, Senior Construction Management and Lead Commissioning Management

TBF + Partner, Zurich

Overall Project Lead – Bunker, Boiler House, Energy Centre, Flue Gas Treatment Building and Decommissioning of the Existing Plant

TBF + Partner, Zurich

Overall Management – Administration Building and External Works

Penzel Valier, Zurich

Technical Planning

Architecture / Design Overall Facility Design:

Penzel Valier, Zurich

Civil Engineering Structural Engineering: AFRY Schweiz, Zurich Civil Works: TBF + Partner, Zurich

Structural: Afry Switzerland, Zurich Foundations: TBF + Partner, Zurich

Construction and Installation Management

TBF + Partner, Zurich S+B Baumanagement, Pratteln I.C.E. AG, Wil

BIM Management

TBF + Partner, Zurich

Building Services Engineering

Overall Project Lead, Technical Coordination, Specialist Engineering and Building Automation:

TBF + Partner, Zurich

HVAC: Triair, Jona SG

Sanitary Engineering: Bösch Sanitäringenieure, Dietikon

Building Electrical Systems: Bering AG, Bern

Sundesign Photovoltaic Engineering: sundesign photovoltaic engineering, Stallikon

Landscape Architecture

Maurus Schifferli Landscape Architect, Bern

Specialists

Building Physics: Gartenmann Engineering, Zurich

Safety and Fire Protection Planning: Hautle Anderegg und Partner, Ostermundigen / Urs Käser AG, Jegenstorf

Environmental Planning and Compensation Measures: TBF + Partner, Zurich

Traffic Planning and Logistics: TBF + Partner, Zurich

Process Technology and EMSRL-T

TBF + Partner, Zurich

TBF Services

  • •Overall Project Management
  • •Overall Site Planning
  • •Technical and Spatial Coordination of All Disciplines
  • •Architectural Design Competition Management
  • •Amendment of the Land Use Plan
  • •Building Permit Approval Process
  • •Preparation of the Environmental Impact Assessment (EIA) Report
  • •Environmental Planning and Liaison with the Authorities
  • •BIM Management
  • •Senior Construction Management
  • •Lead Commissioning Management
  • •Overall Management of Building Services Engineering
  • •Overall Management of the Process Building
  • •Site Master Planning
  • •Process Engineering Design
  • •EMSRL-T Planning
  • •Bunker System Planning
  • •Dust Suppression and Vacuum Cleaning System Planning
  • •Civil Engineering Planning
  • •Acid Flue Gas Scrubbing System Design

Film and Editing: Dominic Büttner, Hammerfilm. Commissioned by Penzel Valier AG.

Questions about this project?

Our Project Team

Overall Planning

Overall Project Management, Senior Construction Management, and Lead Commissioning Management

TBF + Partner, Zürich

Nadia Bruderhofer, Dominique Dietschweiler, Robin Fetz, Martina de Giovanni, Andreas Mettler, Priska Ochsner, Janciga Peethamparam, Joachim Rutz, Dominik Schenk, Roman Schlagenhauf, Mathias Vescovi, Markus Wieduwilt

Overall Projekt Lead – Bunker, Boiler House, Energy Centre, Flue Gas Treatment Building and Decommissioning of the Existing Plant

TBF + Partner, Zürich

Dominique Dietschweiler, Andreas Egolf, Andreas Mettler, Joachim Rutz, Markus Wieduwilt

Technical Planning

Building Services

Building Services Engineering Overall Project Lead, Technical Coordination, Specialist Engineering and Building Automation:

TBF + Partner, Zürich

Yevheniia Annikova, Linus Brunner, Yves Burkhard, Robin Carle, Alba De Oliveira Gonzalez, Sanja Dragosavljevic, Eduardo Duarte Ribeiro, Kushtrim Elezaj, Lina Fjodorova, Misheel Munkh-Erdene, Christopher Neidhardt, Miroslav Pavlovic, Joncard Pfeiffer, Adrian Trachsel, Thomas Tschanen, Amanda Urech, Loris Vogel

Environmental Planning and Compensatory Measures

TBF + Partner, Zürich

Susanne Haag, Mirjam Marty

Traffic Planning

TBF + Partner, Zürich

Andrin Csiba, Philippe Hirsiger

Our Offices in Switzerland

TBF + Partner AG
Schwanengasse 12
3011 Bern
TBF + Partner AG
Quai du Seujet 10
1201 Geneva
TBF + Partner AG
Via Besso 42
6900 Lugano
TBF + Partner AG
Beckenhofstrasse 35
8006 Zurich

Our Offices in Germany

TBF + Partner AG
Alsterarkaden 9
20354 Hamburg
TBF + Partner AG
Mauerkircherstrasse 9
81679 Munich
TBF + Partner AG
Schlossstrasse 70
70176 Stuttgart

Our Office in Italy

TBF + Partner S.r.l.
Via Napo Torriani 29
20124 Milan
Copyright
Title image: Reto Brüllhardt.
Unless otherwise stated, the copyright for all other images belongs to TBF + Partner, Zurich.