Energy and valuable materials for the next generation
With an investment of more than CHF 500 million, kenova is one of Switzerland's most significant infrastructure projects in the fields of environmental services, renewable energy, and circular economy. Located in Zuchwil, the new kenova facility replaces the existing plant after nearly 50 years of operation and will ensure the sustainable treatment of waste from 176 municipalities. As a landmark project for future generations, it plays a key role in advancing the energy transition and strengthening the circular economy. Featuring one of the largest photovoltaic façades in the world, striking architecture, and one of Switzerland's largest renewable energy-based thermal power plants, the facility is also designed to accommodate future carbon capture technology.
The Project at a Glance

Copyright image: Penzel Valier
Key Facts
44,000 m²
410,000 m³
over 1,000 t per working day
250,000 t
12,000 L
Annual electricity generation: 160 GWh
The steam turbine operates at more than 4,000 rpm.
The generator has a maximum output of 37 MW.
The plant generates enough electricity to supply more than 40,000 households.
Waste heat from the plant provides district heating for approximately 12,000 buildings.
120 GWh
5,400 m²
1.4 MWp
56,000 m³
approx. 60%
3,000 m
6,000 m²
2,000 m²
Project Timeline
Start of Project Planning
Architectural Design Competition
Start of Construction
Occupancy
Commissioning
Completion
From Waste to Energy and Valuable Materials
kenova exemplifies the transformation from a conventional waste incineration plant into a modern energy centre. Today, the focus is no longer solely on the safe treatment of waste. Modern facilities recover both energy and valuable materials from waste, helping to close the loop in the circular economy.
The new facility replaces four existing furnace lines with two significantly more powerful and efficient lines. Each year, up to 250,000 tonnes of waste will be converted into electricity, district heating, and recovered materials for further use.
By utilising CO2-free waste heat to generate electricity and district heating, incorporating a large-scale photovoltaic façade, and being designed to accommodate future carbon capture technologies, kenova demonstrates how a waste-to-energy plant can become an important building block of a sustainable energy future. In addition, both ferrous and non-ferrous metals are recovered from the incineration residues, returning valuable materials to the circular economy.


Copyright: Federico Farrinetti

Copyright: Federico Farrinetti
A Project for the Next 50 Years
The new energy centre was not built on a greenfield site but developed alongside the continued operation of the existing facility. While the original plant continued to ensure reliable waste management for the region, the next generation of infrastructure was delivered step by step.
This unique starting point required long-term planning and a holistic approach to the Emmenspitz site. Rather than simply replacing the existing plant, the entire site was reimagined and redeveloped to provide the flexibility needed to accommodate future technologies and evolving requirements for generations to come.
The result is more than just a replacement facility. It lays the foundation for the long-term development of the entire Emmenspitz site.

Copyright: Federico Farrinetti
«Technology alone doesn't shape the future. People who learn together do.»
Our Contribution: Mastering Complexity Together
Delivering the kenova project required far more than technical expertise. Over the course of more than a decade, a wide range of interests, disciplines, and requirements had to be brought together - from strategic decision-making through technical development to construction and on-site delivery.
As overall project manager, TBF + Partner coordinated the collaboration between all project stakeholders and established the organisational framework for successful project delivery. At the heart of the project were not only processes and technology, but above all the people who worked together to bring it to life.
Step by step, this gave rise to a landmark project built on trust, collaboration, and interdisciplinary thinking.
Shaping the Future Together
Infrastructure requirements are constantly evolving. New technologies, changing regulations, and shifting societal expectations demand flexible, future-oriented solutions.
kenova demonstrates how interdisciplinary collaboration, digital methods such as BIM, and the willingness to embrace new approaches contribute to the successful implementation of complex infrastructure projects. In doing so, the future is not shaped by technology alone, but by people working together to develop innovative solutions.

Copyright: Federico Farrinetti


Copyright: Federico Farrinetti
Project Partners
Overall Planning
Overall Project Management, Senior Construction Management and Lead Commissioning Management
TBF + Partner, Zurich
Overall Project Lead – Bunker, Boiler House, Energy Centre, Flue Gas Treatment Building and Decommissioning of the Existing Plant
TBF + Partner, Zurich
Overall Management – Administration Building and External Works
Penzel Valier, Zurich
Technical Planning
Architecture / Design Overall Facility Design:
Penzel Valier, Zurich
Civil Engineering Structural Engineering: AFRY Schweiz, Zurich Civil Works: TBF + Partner, Zurich
Structural: Afry Switzerland, Zurich Foundations: TBF + Partner, Zurich
Construction and Installation Management
TBF + Partner, Zurich S+B Baumanagement, Pratteln I.C.E. AG, Wil
BIM Management
TBF + Partner, Zurich
Building Services Engineering
Overall Project Lead, Technical Coordination, Specialist Engineering and Building Automation:
TBF + Partner, Zurich
HVAC: Triair, Jona SG
Sanitary Engineering: Bösch Sanitäringenieure, Dietikon
Building Electrical Systems: Bering AG, Bern
Sundesign Photovoltaic Engineering: sundesign photovoltaic engineering, Stallikon
Landscape Architecture
Maurus Schifferli Landscape Architect, Bern
Specialists
Building Physics: Gartenmann Engineering, Zurich
Safety and Fire Protection Planning: Hautle Anderegg und Partner, Ostermundigen / Urs Käser AG, Jegenstorf
Environmental Planning and Compensation Measures: TBF + Partner, Zurich
Traffic Planning and Logistics: TBF + Partner, Zurich
Process Technology and EMSRL-T
TBF + Partner, Zurich
TBF Services
- •Overall Project Management
- •Overall Site Planning
- •Technical and Spatial Coordination of All Disciplines
- •Architectural Design Competition Management
- •Amendment of the Land Use Plan
- •Building Permit Approval Process
- •Preparation of the Environmental Impact Assessment (EIA) Report
- •Environmental Planning and Liaison with the Authorities
- •BIM Management
- •Senior Construction Management
- •Lead Commissioning Management
- •Overall Management of Building Services Engineering
- •Overall Management of the Process Building
- •Site Master Planning
- •Process Engineering Design
- •EMSRL-T Planning
- •Bunker System Planning
- •Dust Suppression and Vacuum Cleaning System Planning
- •Civil Engineering Planning
- •Acid Flue Gas Scrubbing System Design
Film and Editing: Dominic Büttner, Hammerfilm. Commissioned by Penzel Valier AG.
Questions about this project?
Our Project Team
Overall Planning
Overall Project Management, Senior Construction Management, and Lead Commissioning Management
TBF + Partner, Zürich
Nadia Bruderhofer, Dominique Dietschweiler, Robin Fetz, Martina de Giovanni, Andreas Mettler, Priska Ochsner, Janciga Peethamparam, Joachim Rutz, Dominik Schenk, Roman Schlagenhauf, Mathias Vescovi, Markus Wieduwilt
Overall Projekt Lead – Bunker, Boiler House, Energy Centre, Flue Gas Treatment Building and Decommissioning of the Existing Plant
TBF + Partner, Zürich
Dominique Dietschweiler, Andreas Egolf, Andreas Mettler, Joachim Rutz, Markus Wieduwilt
Technical Planning
Civil Engineering
TBF + Partner, Zürich
Richard Fülöp, Christian Hengemühl, Raphael Jucker, Anton Krasniqi, Elias Lechner, Matthias Vescovi
Construction and Installation Management
TBF + Partner, Zürich
Tobias Abächerli, Julian Boyer, Linus Brunner, Robin Fetz, Joel Haas, Rudolf Hochuli, Kai Kaufmann, Philippe Locher, Fernando Moscatello, Markus Schmid, David da Silva, Adrian Trachsel, Matthias Vescovi, Helma Winking
IT
TBF + Partner, Zürich
Áedán Christie, Kevin Müller, Maurice Hostettler, Aaron Häusler, Michael Tartak
Building Services
Building Services Engineering Overall Project Lead, Technical Coordination, Specialist Engineering and Building Automation:
TBF + Partner, Zürich
Yevheniia Annikova, Linus Brunner, Yves Burkhard, Robin Carle, Alba De Oliveira Gonzalez, Sanja Dragosavljevic, Eduardo Duarte Ribeiro, Kushtrim Elezaj, Lina Fjodorova, Misheel Munkh-Erdene, Christopher Neidhardt, Miroslav Pavlovic, Joncard Pfeiffer, Adrian Trachsel, Thomas Tschanen, Amanda Urech, Loris Vogel
Process Engineering and EMSRL-T
TBF + Partner, Zürich
Tobias Abächerli, Alica Benedict, Kamil Bischof, David Brönnimann, Jonas Bütikofer, David Da Silva, Martina De Giovanni, Dominique Dietschweiler, Robin Fetz, Thomas Gäumann, Joel Haas, Rudolf Hochuli, Simone Imfeld, Marlene Lasser, Philippe Locher, Manuel Luck, Andrea Reutimann, Markus Schmid, Ivo Schregenberger, Florian Schürz, Nicole Selber, Thomas Stegmann, Daniel Steinacher, Markus Wieduwilt, Patrik Wipfli
Stefan Biland, Julian Boyer, Philippe Chassot, Sanja Dragosavljevic, Ilir Elmazi, Brigitte Greenwood, Kai Kaufmann, Markus Luchsinger, Andrea Pedretti, Raquel Porras Rueda, Elkin Rondon, Massimo Tartaglione, Helma Winking
Our Offices in Switzerland
Schwanengasse 12
3011 Bern
Quai du Seujet 10
1201 Geneva
Via Besso 42
6900 Lugano
Beckenhofstrasse 35
8006 Zurich
Our Offices in Germany
Alsterarkaden 9
20354 Hamburg
Mauerkircherstrasse 9
81679 Munich
Schlossstrasse 70
70176 Stuttgart
Our Office in Italy
Via Napo Torriani 29
20124 Milan
Title image: Reto Brüllhardt.
Unless otherwise stated, the copyright for all other images belongs to TBF + Partner, Zurich.